How We Work

JCO(E) LINE

EDGE MILLING/PRE-BENDING

JCO PRESSING

TACK WELDING

INSIDE WELDING

HYDROSTATICS TESTING

END FACING

CALIBRATION (COLD EXPANDING)

OUTSIDE WELDING

AUTO ULTRASONIC TESTING IF REQUIRED ACC TO SPEC

X-RAY TESTING WITH RECORDED DVD AS PER REQUEST

HEAT TREATING IF REQUIRED ACC. TO SPEC

INSPECTING & PACKING

ROLL-BENDER LINE

PLATE GAS CUTTING

3 ROLL BENDING

TACK WELDING

12M LONGITUDINAL WELDING (INSIDE)

12M GRITH WELDING (OUTSIDE)

12M GRITH WELDING (INSIDE)

FITTING UP

12M LONGITUDINAL WELDING (OUTSIDE)

120″ HYDROSTATICS TESTING IF REQUIRED

X-RAY TEST WITH RECORDED DVD AS PER REQUEST

FURNACE (HEAT TREATMENT) IF REQUIRED ACC. TO SEPC

INSPECTING & PACKING